with a few more lengths of rail in place, after several years at its current length, the running line finally started to extend.
|
Using approx 7 sleepers per rail length each sleeper is droped in the surface aabout 3ft apart, dug in a few inches then checked with the level against the previous sleeper, so after digging in 7 sleepers the two rails can be dropped on top, hopefully with a minimum of adjustment before spiking down.
|
Although on the surface the conditions were still quite muddy because of the clay soil, it was quite firm just a few inches down, and the sleepers were dug in without ballast. The infrequent use and light axle loads makes this possible.
|